Completed Project

Commercial Bathroom Facility Upgrade

Winery at Auburn, SA

  • Commercial Builder

    • Reconfigured existing space to convert one bathroom into two separate facilities

    • Converted one of the bathrooms into a compliant ambulant bathroom

    • Performed demolition works as required and responsibly removed all debris

    • Partial removal and reinstatement of the concrete floor slab to allow for the installation of new underfloor sewer drainage pipework

    • Upgraded mains water and drainage systems to suit new layout and code requirements

    • Supplied and installed a thermostatic mixing valve to meet compliance and safety standards

    • Installed new fittings, fixtures, and accessories to specification

    • Delivered with minimal disruption to business operations

    • Maintained a clean, safe, and quiet work environment throughout

    • Coordinated closely with builder and other trades to meet program timelines

    • Successfully reconfigured existing space, converting one bathroom into two separate facilities

    • Delivered a fully compliant ambulant bathroom meeting accessibility standards

    • Installed new fittings, fixtures, and accessories to specification with quality workmanship

    • Completed all works with minimal disruption to business operations

    • Maintained a clean and safe work environment throughout the project

    • Coordinated effectively with the builder and other trades to meet project deadlines

Previous
Previous

Residential Bathroom Disconnect/Reconnect

Next
Next

Residential Fire Rebuild